Construction Projects - Policy 6.050
| Authority: | Florida Statute 1001.64; 1013.45; 1013.40;1013.48; 1004.65FAC 6A-14.0247; .0262; 6A-2 |
| Date Adopted: | 7/82; Rev. 7/92; 6/02 |
Policy:
- It is the policy of the Board that the College shall administer
construction projects in accordance with law, rules, regulations and
related local requirements.
- The President or designee shall establish procedures to ensure that
construction projects are implemented in a manner consistent with the
educational program of the College.
- Board approval shall be required for relevant facility related
documents which may include, but are not limited to a facility master
plan, educational plant survey, professional service contracts, bid
documents and recommendations, reports for completion, inspection,
occupancy and other construction related documents.
- The Board authorizes the President or designee to approve change
orders up to Category II of F.S. 287.017 per change order between Board
meetings. Any such action shall be reported to the Board for
ratification at the next regularly scheduled meeting.
- Payment to Contractors shall be in accordance with Board approved documents less any retainage.
- A construction project approved by the Board shall be formally
accepted by the Board on completion before the retainage is released
and final payment is made. The President or designee shall be
responsible for determining that all obligations have been met and all
appropriate inspections have been made in accordance with the
provisions of the State Board of Education rules. At its discretion the
Board may decline to release all or part of the retainage if any
unreasonable amount of time lapses in resolving disputed items required
for completion of the project.
|